RFB for Prado Basin Short Term Sediment Removal Compliance Project – Phase I (Contract No. PB-2025-1)
The Orange County Water District is currently seeking bids for removing up to 100,000 cubic yards (CY) of sediment within Prado Basin at an existing sand trap constructed by the District in 2020 adjacent to the Santa Ana River and storing the sediment at a new stockpile location. The CONTRACTOR shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and provide erosion and water quality management per the approved plan; complete pre and post-construction surveys by a Professional Land Surveyor licensed in the State of California; clear and grub the sediment trap, existing access road, and stockpile locations; complete minor improvements to the existing access road; construct and maintain the stockpile locations including demolishing existing facilities and grading; excavate and transport up to 100,000 CY of sediment from the sediment trap, haul along the access road, and deposit in the stockpile site; complete final cleanup of all work areas and demobilize; and, at the option of the District, hydroseed and hydromulch the stockpile site and remove up to 50,000 CY of additional sediment.
To download a copy of the RFB for Prado Basin Short Term Sediment Removal Compliance Project – Phase I (Contract No. PB-2025-1), please refer to the posting on the OCWD Planroom located here: https://www.ocwdplanroom.com/.
Please note the following solicitation schedule:
| RFB Issued | Monday, June 30, 2025 |
| Non-Mandatory Prebid Meeting (In-person) | Meeting Project Site: 14980 River Rd., Corona, CA 92880 on Monday, July 7, 2025 at 10:00AM PT |
| Questions Due Date | Thursday, July 10, 2025 by 2:00PM PT |
| Bids Due | Thursday, July 24, 2025 by 2:00PM PT |
For questions, please contact procurement@ocwd.com.