RFB for Asphalt Pavement Rehabilitation 2025 Project, Contract No. WF-2025-1

The Orange County Water District (“OCWD” or District) is seeking bids for the Asphalt Pavement Rehabilitation 2025 Project. The work necessary for the completion of this contract consists of, but is not limited to,  (1) distributing notices to affected residents, businesses, any parks and trails facilities and their associated users noted in respected construction and encroachment permits from cities, agencies and OCWD; (2) traffic control; (3) construction surveying; (4) removing existing asphalt or concrete areas within parking facilities, streets, roads, drive approaches, sidewalks, curb and gutter, curb access ramps, concrete valley gutters and driveways; (5) constructing new concrete drive approaches, sidewalks, curb and gutter, compliant curb access ramps, and driveways; (6) protecting, adjusting and/or installing new OCWD utility covers to grade; (7) replacing and repainting obliterated or damaged traffic striping; (8) coordinating with subcontractors to adjust utility facilities to grade; (9) repaint curb and traffic lanes, replace wheel stops, striping, markers, and traffic loops; and (10) other incidental  items to be completed in work places required by the Contract Documents.

To download a copy of the RFB for Asphalt Pavement Rehabilitation 2025 Project, Contract No. WF-2025-1, please refer to the posting on the OCWD Planroom located here ocwdplanroom.com.

Please not the following solicitation schedule:

RFB Issued Wednesday, February 4, 2026
Non-Mandatory Pre-Bid Meeting Wednesday, February 18, 2026 at 10:00AM PT held at OCWD’s main facility, 18700 Ward St, Fountain Valley, CA 92708
Questions Due Friday, February 20, 2026 at 10:00AM PT
Bids Due Tuesday, March 3, 2026, by 2:00PM PT

For questions, please contact at procurement@ocwd.com.