Green Acres Project pipeline valve repairs project

2018 Green Acres Project Pipeline Valve Repairs Project
Contract number GA-2019-1

PLEASE TAKE NOTICE that sealed bids will be received at the office of the Contracts Administrator of the Orange County Water District ("District"), 18700 Ward Street, Fountain Valley, CA 92708 (mailing address: P.O. Box 8300, Fountain Valley, CA 92728-8300), until 2 p.m. local time on Tuesday, April 30, 2019, at which time the bids will be publicly opened and read aloud for performing all work and furnishing all labor, materials and equipment for:

The 2018 Green Acres Project (GAP) Pipeline Repairs Project consists of repairing, replacing, and adjusting to grade 17 GAP pipeline valves and other appurtenances within the cities of Costa Mesa, Fountain Valley, Huntington Beach, and Santa Ana. The work includes, but is not limited to the following: obtain encroachment permits and prepare and implement traffic control plans for the work areas located in the various jurisdictions; prepare safe work plans for excavation and nuisance water control; mobilization; pavement and concrete removal and replacement; sheeting, shoring and bracing for the work in accordance with all applicable State and Federal OSHA standards; valve and/or pipeline appurtenance removal, repair and replacement; traffic stripe replacement to match existing striping, and final cleanup and demobilization.

The work is to be done in accordance with the plans, specifications and contract documents on file in the District office, 18700 Ward Street, Fountain Valley, California, which plans and specifications are designated as above, and which documents are by this reference incorporated herein.

Plans and specifications and all contract documents must be purchased through HB Digital at www.ocwdplanroom.com. Payment will not be refunded and the plans and specifications and contract documents are not required to be returned.