Orange County Water District Board Of Directors Information OCWD Site Index Water Glossary Jobs at OCWD Links To Other Water-related Sites Programs Projects OCWD News and Information About Orange County Water District
Orange County Water District Orange County Water District
Orange County Water District
Orange County Water District
OCWD Sidebar Navigation
PROJECTS: Water Factory 21 - Overview | Treatment Process | WF21 Costs | Water Quality | Virtual Tour | Tours



INJECTION

The purpose of Water Factory 21 is to produce a water supply for the Talbert Barrier to prevent seawater intrusion. Final plant effluent, meeting all California Department of Health Services primary and secondary drinking water standards, is pumped into the groundwater basin via a series of 23 multi-point injection wells with a total of 81 individual injection points. Injection wells are placed approximately every 600 feet along Ellis Avenue from the Santa Ana River to the bluffs at Beach Boulevard. This injected water forms a freshwater mound between the ocean and the groundwater basin, providing a hydraulic barrier to seawater intrusion and permitting the groundwater basin to be safely drawn below sea level.

Once underground, some of the injected water flows toward the ocean, forming the seawater barrier. The majority of the water, however, flows into the groundwater basin to augment Orange County's domestic groundwater supply.

 

 

 

Previous Section: Chlorination and Blending | Next Section: Water Quality

Water Conservation Information

The information from this section is
also available in the WF21 Brochure:



ocwdwf21.pdf
(Requires free Adobe Acrobat Reader)

Search using the Google search engine:
Google

Search WWW Search


About OCWD | Board of Directors | News | Projects | Programs | Jobs | Links | Glossary | Index | Home
©1997 - 2001 Orange County Water District. All Rights Reserved.
Last Modified:Friday, May 11, 2001